Crane Rental in Makkah

Crane work in Makkah is tied to tall buildings and hotels that need equipment lifted onto roofs and structures and façades erected, on sites surrounded by closely spaced buildings and dense pedestrian traffic. In that setting the site, access and coordination with the relevant authorities are the first questions, before the class is chosen on the numbers.

This page lists classes from 25 t to 500 t, how to settle the class for a crowded site, and what to ask before you request a quote. It makes no promise on availability or delivery time, and it does not say what a quote includes in terms of operator, rigger or permits; the quote sets that out.

Crane classes listed for rent in Makkah

Max capacityBoom lengthTypeDetails
25 t (approx.)up to about 30 mMobile craneCrane 25 t in Makkah
50 t (approx.)up to about 40 to 45 mMobile craneCrane 50 t in Makkah
100 t (approx.)up to about 50 to 60 mAll terrain / mobile craneCrane 100 t in Makkah
200 t (approx.)up to about 60 to 70 mHeavy mobile / crawler craneCrane 200 t
300 t (approx.)up to about 70 to 80 mHeavy mobile / crawler craneCrane 300 t
500 t (approx.)up to about 90 to 100 mHeavy crawler craneCrane 500 t

Capacities are approximate and change with lift radius. Availability of a class and access to your site in Makkah are confirmed after you send the request, and we do not promise either before that. To compare two classes see crane 25 t vs 50 t.

Which crane class fits your job in Makkah

Before the three numbers (load weight with rigging, radius and height) ask: can a heavy truck get here, stand and open its outriggers on this site, and at what time? If not, the class that is best on engineering is of no use. Between closely spaced buildings the available space may fix the radius and constrain the class.

Type of jobUsual classWhat to defineNote
Lifting air-conditioning or services equipment onto a hotel or tower roof25 to 50 t usuallyUnit weight and the distance of the roof from the standing positionThe permitted standing position, neighbouring buildings and cables
Erecting a structure or upper façade50 to 100 t usuallyFinal height and boom lengthClosing the pedestrian route and coordinating the time
Site between closely spaced buildings and a narrow streetSet by the three numbers and the standing spaceSpace to spread outriggers and boom swing limitsSpace may call for a different class than weight suggests
Lifting on a large construction project100 t and aboveCrane type and transport routeHeavy truck movement restrictions
Lifting outside peak hoursSet by the three numbersThe permitted time windowEarly coordination with the relevant authority

What changes the choice in Makkah

Heavy truck movement is restricted in some parts of the city and at some times, and it gets harder in peak seasons; the relevant authorities set these limits. A crane is a heavy truck that needs a clear transport route and a confirmed standing position, so ask your project owner about restrictions before you set the lift date, and we do not promise a date before reviewing the details.

In an area crowded with pedestrians a route under the boom has to be closed for the whole lift and that coordinated with the relevant authority, which is outside our control. Send a photo of the site and a plan if you have one so we can assess before any arrangement.

Service areas in Makkah

This page is for equipment rental requests in Makkah. Please contact us to confirm equipment availability and suitable transport options. Tell us the district or exact site when you ask, as it helps us assess access and transport. Areas listed on the site: Central Area, Al Aziziyah, Ash Shawqiyah, Al Kakiyah.

Safety and site checks in Makkah

No load is lifted over an open walkway or an occupied building. The pedestrian route under the boom is isolated with barriers and a signaller for the whole lift, and the lift zone is marked out and kept clear of people. If isolation is not possible, the lift does not start.

Confirm the boom area is clear of cables, canopies and buildings, and that the outriggers stand on confirmed ground and not over a basement or services. A crane is run by a qualified operator and heavy loads need a rigger or signaller; this page does not say who supplies them or who obtains permits, and the quote does.

How to request a crane in Makkah

  • The load weight and rigging gear
  • Lift radius and final height
  • The exact district or address, and photos of the site, neighbouring buildings and street
  • The standing position available, outrigger space and what lies beneath
  • The lift date and the permitted time window
  • Heavy truck restrictions your site knows about, and whether you need an operator and rigger

We do not publish fixed prices here, because the price depends on the class, the rental period, the site and the transport arrangements. See what affects the rental price.

Request a quote: quote request form, WhatsApp or call us.

Questions to settle before you order in Makkah

Can a crane be brought to my site?

It depends on transport restrictions, the standing position and the surroundings. Send the location and photos and we confirm what is possible before any commitment, with no promise in advance.

How do I lift equipment onto a tower roof between closely spaced buildings?

Send the unit weight with rigging, the roof height and the distance of the available standing position. The available space may decide the class.

Does the quote include an operator, rigger and permits?

We do not state that on this page; the quote sets it out after we receive your details.

Can the lift be done outside peak hours?

You can ask for it and state it. It depends on what the relevant authorities and your site allow.

Related pages

Frequently Asked Questions

Why is the load weight not enough to specify a crane class?

Because a crane capacity falls as the lifting radius increases - the further the set-down point is from the machine centre. A crane rated at 50 tons may have only a fraction of that at a 20-metre radius. Specification therefore starts from two numbers together: the weight, and the horizontal distance between where the crane stands and where the load lands.

What needs to be ready on site before the crane arrives?

A level, stable standing position with room to deploy outriggers, confirmation that the ground bears the pressure beneath them, an approach route that accommodates the machine width and height, and a secured lift area nobody passes beneath. The load weight is established precisely before lifting rather than estimated, and wind speed limits belong in the lift plan.

How do I confirm a size is available in Makkah?

Availability depends on the size requested, the dates and the project location within Makkah, so it is confirmed per request rather than shown on the page. Send those details through the quote form or WhatsApp and you will get a reply confirming availability.

What does it cost to rent in Makkah?

There is no published price list: the rate changes with size, hire duration, project location and delivery arrangements, so a single number would be misleading for most cases. Send your project details and you will get a quote built on them.

Does the hire include an operator?

It depends on the machine and your project requirements. Cranes and excavators require a qualified operator, while scissor lifts and man lifts can be run by a trained technician. State what you need when requesting a quote so the price covers it.

What hire durations are available?

From a single day to more than a month. Short defined jobs suit daily hire; work running for weeks is cheaper per unit of time on weekly or monthly hire. Bear in mind that each delivery and collection cycle carries its own cost, so scattering a job across separate short hires usually costs more than one continuous period.

Request a quote

Your details
Equipment needed
Project details

Your request is saved, then WhatsApp opens with a ready message to confirm the details with the rental team. Availability, transport and operating costs are set after reviewing the project site and rental period.